Energy
Air4NRG
Air4NRG’s main objective is the development of an innovative, efficient, long-term, sustainable Compressed Air Energy Storage prototype, which can enhance...


Project dates
2020-2024
Website
Role of Zabala
partner
Project led by
Iberdrola
12
Partners
5
Countries
25
M€ budget
4
Years
The FLAGSHIP project aims to demonstrate the cost-effectiveness of a 10MW floating offshore wind turbine (FOWT) to ensure LCOE reduction in the range of €40-60/MWh in 2030.
Floating offshore wind (FOW) holds the key to an inexhaustible resource potential in Europe to reduce the levelized cost of energy in deep water (>60m). The industry expects costs to reach €100-80/MWh for the first commercial-scale projects using existing proven technologies and reaching the final investment decision between 2023 and 2025. During that period, the FOWT would generate 1GW of cumulative installed capacity in Europe and projects funded at that time could be online within 3 years. Costs are expected to decrease even faster at “mature” commercial scale, reaching €40-60 /MWh in 2030, if proper visibility in terms of volumes and industrialisation is considered.
The FLAGSHIP project will develop the first demonstration of a 10MW floating wind turbine to ensure the reduction of the Levelized Cost of Energy in the €40-60 €/MWh range. This will be demonstrated on a 1:1 scale in the Norwegian North Sea. It is a robust and innovative semi-submersible concrete floating platform that includes an easy-to-install anchor design, innovative designs and mooring configurations, as well as new cable designs with optimised installation and lifetime management procedures.
This project expects to decrease the Levelized Cost of Energy and environmental impacts, while increasing the market value of floating wind energy. The Levelized Cost of Energy measures the lifetime cost divided by energy production, with the objective of calculating the value of the total cost of building and operating a power plant over an expected lifetime.


This project has been financed by the European Union’s Horizon 2020 Research and Innovation programme, under grant agreement No. 875629.

“Flagship is a key step towards reducing the cost of floating offshore wind energy, which will make commercial wind farms a promising option in the field of renewable energy”
Ana Lumbreras
Dissemination and Communication in European Projects










Energy
Air4NRG’s main objective is the development of an innovative, efficient, long-term, sustainable Compressed Air Energy Storage prototype, which can enhance...
Agroalimentation and bioeconomy
ToNoWaste it is an open innovation ecosystem designed to leverage previous findings for the identification of social, technical/environmental, economic, political/legal,...
Energy
NESOI aims to unlock the potential of EU islands to integrate the European Energy Transition.

News
Transnational cooperation
Proposals can be submitted until 14 February 2025, focusing on innovation, environment, and sustainable tourism

Opinion
HORIZON EUROPE

Juan José Candel
Team leader specialising in European programmes

Publication
LIFE 2021-2027
Thanks to our Kaila platform, you can improve your LIFE proposal with tips and timelines so you don’t miss any key dates.
The important thing is not to keep moving, but rather to know in which direction to go. Our 37% success rate proves that we know how to guide our clients.
Our compass is our clients; our mission is to solve their problems, guiding them so that innovation becomes their key to competitiveness.
